Representation

Nupche Likhu Hydropower Project

Project Specifications

INSTALLED CAPACITY:
57.5 MW
No of Unit:
3
UNIT CAPACITY:
19.1 MW
TURBINE TYPE:
Pelton
Net Head:
974.12 m

Project Overview

INSTALLED CAPACITY

57.5 MW

No of Unit

3

UNIT CAPACITY

19.1 MW

TURBINE TYPE

Pelton

Net Head

974.12 m

The source of water for Nupche Likhu hydropower project is originated from snow fed rivers starting from the High Mountain/Hilly areas. The proposed Nupche Likhu Hydropower Project is located in Gumdel VDC (Currenty Umakunda Rural Municipality) of Ramechhap District, Nepal. The proposed intake of the Nupche Likhu Hydropower Project is located north of Lahaksewar village in left bank of Nupche Khola at an elevation of 3330 m above msl. With the assistance of GCE Group, Turnkey contract for Supply Delivery, Erection, Installation & Commissioning of Electro-mechanical equipment for Nupche Likhu Hydro Power Project had been awarded to VOITH Hydro Pvt. Ltd.

Get In Touch

Ready to explore opportunities, discuss partnerships, or inquire about services? Get in touch and let's embark on a journey of collaboration and success together.

Get in Touch
Copyright 2026. GCE Group. All Rights Reserved. Handcrafted by Featherwebs