Our main objective is to render high level technical and professional consultancy services in the field of hydropower, transmission lines, road, irrigation, and other infrastructure projects.
Consultation
| Name of the Assignment | Scope of Work | Client |
|---|---|---|
|
Contract Management and Related Works for Construction of Sunkoshi Marin Diversion Multipurpose Project (DWRI/SMDMP/CS-01/2076-77) Sindhuli April, 2022 - Ongoing |
The work involves design review, construction supervision, quality control, project management, construction and contract management. SMDMP aims at producing hydropower and providing irrigation facility in the southern plains of Province 2. The project plan includes construction of barrage across the Sunkoshi River to divert 67 Cumecs water through a 13.1 km concrete lined tunnel to be constructed by using a Tunnel Boring Machine (TBM) followed by a surface powerhouse positioned on the Marin River in Kusumtar of Kamalamai Municipality, Sindhuli District. The diverted water along with available head between the intake and powerhouse will be utilized to produce 28.62 MW hydropower. The water downstream of the tailrace flows through the Marin River down to Bagmati river. The discharge of Bagmati River will be augmented by a more or less constant quantity diverted from Sunkoshi River which will facilitate a year-round irrigation in about 122,000 hectares of irrigable land in Bara, Rautahat, Sarlahi, Mahottari and Dhanusa districts |
Department of Water Resources and Irrigation under the Ministry of Energy, Water Resources and Irrigation |
|
Contract Management and Related Works for Construction of Sunkoshi Marin Diversion Multipurpose Project (DWRI/SMDMP/CS-01/2076-77) Sindhuli September, 2024 - Ongoing |
The work involves design review, construction supervision, quality control, project management, construction and contract management. SMDMP aims at producing hydropower and providing irrigation facility in the southern plains of Province 2. The project plan includes construction of barrage across the Sunkoshi River to divert 67 Cumecs water through a 13.1 km concrete lined tunnel to be constructed by using a Tunnel Boring Machine (TBM) followed by a surface powerhouse positioned on the Marin River in Kusumtar of Kamalamai Municipality, Sindhuli District. The diverted water along with available head between the intake and powerhouse will be utilized to produce 28.62 MW hydropower. The water downstream of the tailrace flows through the Marin River down to Bagmati river. The discharge of Bagmati River will be augmented by a more or less constant quantity diverted from Sunkoshi River which will facilitate a year-round irrigation in about 122,000 hectares of irrigable land in Bara, Rautahat, Sarlahi, Mahottari and Dhanusa districts |
Department of Water Resources and Irrigation under the Ministry of Energy, Water Resources and Irrigation |
|
Contract Management and Related Works for Construction of Sunkoshi Marin Diversion Multipurpose Project (DWRI/SMDMP/CS-01/2076-77) Sindhuli September, 2024 - Ongoing |
The work involves design review, construction supervision, quality control, project management, construction and contract management. SMDMP aims at producing hydropower and providing irrigation facility in the southern plains of Province 2. The project plan includes construction of barrage across the Sunkoshi River to divert 67 Cumecs water through a 13.1 km concrete lined tunnel to be constructed by using a Tunnel Boring Machine (TBM) followed by a surface powerhouse positioned on the Marin River in Kusumtar of Kamalamai Municipality, Sindhuli District. The diverted water along with available head between the intake and powerhouse will be utilized to produce 28.62 MW hydropower. The water downstream of the tailrace flows through the Marin River down to Bagmati river. The discharge of Bagmati River will be augmented by a more or less constant quantity diverted from Sunkoshi River which will facilitate a year-round irrigation in about 122,000 hectares of irrigable land in Bara, Rautahat, Sarlahi, Mahottari and Dhanusa districts |
Department of Water Resources and Irrigation under the Ministry of Energy, Water Resources and Irrigation |
|
Contract Management and Related Works for Construction of Sunkoshi Marin Diversion Multipurpose Project (DWRI/SMDMP/CS-01/2076-77) Sindhuli April, 2026 - Ongoing |
The work involves design review, construction supervision, quality control, project management, construction and contract management. SMDMP aims at producing hydropower and providing irrigation facility in the southern plains of Province 2. The project plan includes construction of barrage across the Sunkoshi River to divert 67 Cumecs water through a 13.1 km concrete lined tunnel to be constructed by using a Tunnel Boring Machine (TBM) followed by a surface powerhouse positioned on the Marin River in Kusumtar of Kamalamai Municipality, Sindhuli District. The diverted water along with available head between the intake and powerhouse will be utilized to produce 28.62 MW hydropower. The water downstream of the tailrace flows through the Marin River down to Bagmati river. The discharge of Bagmati River will be augmented by a more or less constant quantity diverted from Sunkoshi River which will facilitate a year-round irrigation in about 122,000 hectares of irrigable land in Bara, Rautahat, Sarlahi, Mahottari and Dhanusa districts |
Department of Water Resources and Irrigation under the Ministry of Energy, Water Resources and Irrigation |
| Name of the Assignment | Scope of Work | Client |
|---|---|---|
|
EHSS Specialist Support for Worldlink Communications Limited Surkhet, Kathmandu September, 2022 - Ongoing |
Environmental, Health & Safety and Social (EHSS) Specialist Advisory |
Worldlink Communication Ltd |
|
Detailed Feasibility Study of Iron and Steel Plant Based on Dhaubadi Iron Ore Deposit, East Nawalparasi, Gandaki Province, Nepal Nawalparasi September, 2022 - Ongoing |
Detail feasibility study and to assess the feasibility of establishing an iron mine, iron ore processing plant, and steel manufacturing plant |
Dhaubadi Iron Company Limited |
| Name of the Assignment | Scope of Work | Client |
|---|---|---|
|
TA-9461 REG: Protecting and Investing in Natural Capital in Asia and the Pacific – Smart Infrastructure Planning and Design, Nepal, Narayanghat-Hetauda-Pathlaiya Road Section (106 Km) of the East-West Highway Chitwan, Makwanpur, Bara, Parsa Districts July, 2022 - Completed |
Lenth- 106 Km |
Asian Development Bank |
|
Consulting Service for Green and Resilient Strategy for Nepal’s Selected Highway Corridors East West – Mahendra Highway and North South – Koshi Corridor Highway September, 2021 - Ongoing |
Lenth- 1,400 km (approx..) |
World Bank Group |
|
Technical, legal, environmental and social advisory services for the construction/upgradation of Narayanghat-Butwal Road (115 Km) from 2 lane to 4 lanes under ADB SASEC Road Improvement Project (SRIP) Chitwan, Nawalparasi, Rupandehi Districts April, 2026 - Ongoing |
Lenth- 115 Km |
GCE Group Pvt. Ltd |
|
Feasibility study of Access Road (26 Km) for Kaligandaki Storage Hydropower Project (844 MW) Parbat, Myagdi District April, 2026 - Ongoing |
Lenth- 26 KM |
Department of Electricity Development |
|
Detailed Design of Access Road (29 Km) for Simbuwa Khola Hydropower Project (70.34 MW) Excavation Volume: 1,419,500 m3 Taplejung District April, 2026 - Ongoing |
Lenth- 29 Km |
Remit Hydro Limited, Kathmandu, Nepal |
|
Detailed Design of Access Road (8 Km) for Upper Seti Hydropower Project (20 MW) Excavation Volume: 203,894 m3 Kaski District April, 2026 - Ongoing |
Lenth- 8 Km |
Upper Seti Hydro Pvt. Ltd. |
|
Detailed Design and Survey of access road (12 Km) for Kabeli -3 HEP (21.93 MW) Excavation Volume: 101,700 m3 Taplejung District April, 2026 - Ongoing |
Lenth- 12 Km |
Kabeli Hydropower Development. Co. P. Ltd |
|
Construction Supervision of Access Road (15.3km) for 216 MW Upper Trishuli-I Hydroelectric Project. Excavation Volume: 845,700 m3 Rasuwa District April, 2026 - Ongoing |
Lenth- 15.3 |
Nepal Water and Energy Development Company Pvt. Ltd. (NWEDC) |
|
Detailed Design and Survey of access road of about 14 Km length from Jumla Khalanga Bazar to proposed headworks site of Jawa Khola Hydropower Project (15.25 MW) Excavation Volume: 78,200 m3 Jumla District April, 2019 - Completed |
14 Km |
Department of Electricity Development |
|
Feasibility Study of Access Road (12.7 Km) for Upper Seti Hydropower Project (20 MW) Kaski District April, 2018 - Completed |
Lenth- 12.7 Km |
Upper Seti Hydro Pvt. Ltd. |
|
Detailed Design of Access Road (10.8 Km) for Karuwa Seti Hydropower Project (32 MW) Excavation Volume: 180,000 m3 Kaski district July, 2018 - Completed |
Lenth- 10.8 Km |
Jhyamolongma Hydropower Development Company (P) Ltd |
|
Detailed Design of Access Road (36 Km) for Upper Lapche Khola Hydropower Project (52 MW) Excavation Volume: 210,100 m3 Elevation: up to 3700 m above sea level Dolakha District July, 2017 - Completed |
Lenth - 36 Km |
Energy Venture Pvt. Ltd. |
|
Detail Design of Access Road (15.3 km) for 216 MW Upper Trishuli-I Hydroelectric Project. Excavation Volume: 726,500 m3 Rasuwa District April, 2014 - Completed |
Lenth- 15.3 Km |
Saman Engineering, Korea |
|
Survey and Detail Design of 26 Km Access Road for Lower Arun Hydroelectric Project (400 MW) Sankhuwasabha District September, 2013 - Completed |
Lenth- 26 Km |
Braspower International Engineering, Brazil |
|
Feasibility Study of Access Road (18.8 Km) for Upper Trisuli – 1 HEP (216 MW) Excavation Volume: 736,900 m3 Rasuwa District January, 2012 - Completed |
Lenth- 18.8 |
Nepal Water and Energy Development Company Pvt. Ltd. |
|
Feasibility Study of Access Road (12 Km) for Upper Marsyangdi-2 HEP (125 MW) Manang & Lamjung Districts January, 2008 - Completed |
Lenth- 12 Km |
Himtal Hydropower Co.Ltd. |
| Name of the Assignment | Scope of Work | Client |
|---|---|---|
|
External Monitoring of Lower Kopili Hydroelectric Project (120 MW), Assam, India Assam, India December, 2021 - Ongoing |
Independent monitoring of the implementation of Social and Environment Safeguard aspects as per the requirement of the national regulatory requirements and ADB’s SPS 2009 during the design, construction, and operation phases. |
Assam Power Generation Corporation Limited |
|
Assam Intra State Transmission System Enhancement Project
April, 2026 - |
Consulting Services For Project Implementation and Management Support |
Assam Electricity Grid Corporation Limited |
| Name of the Assignment | Scope of Work | Client |
|---|---|---|
|
Consulting Services for Detailed Survey and updated Line Design for 30 km of Changes in 400 kV Transmission Line Route Alignment Nuwakot, Dhading, Makwanpur, Tanahu, Nawalparasi, Kathmandu September, 2024 - Completed |
Inception of Assignment. Detailed Field Survey and Preliminary Engineering Design. Geo-Technical Investigation. Detailed Environmental and Social Assessment including flood risk assessment. Pegging activities. Preparation of final survey report after finalization of route and site verification. |
Millennium Challenge Account Nepal (MCA-Nepal) |
|
Consulting Services for Detailed Engineering and Environmental Study Phukot April, 2026 - |
Karmadev (Indo – Nepal Boarder) – Phukot (Kalikot) is a 130 km double circuit line project, which also includes two 400 kV GIS substations at Phukot and Betan. This transmission line will be called Karnali Corridor transmission line and will connect to the Cross boarder Connection. This transmission line will evacuate the power produced from the Karnali Corridor Hydropower generators Jade Consult is working in this project with Power Grid Corporation of India Limited, India and providing assistance in: 1. Detailed Survey of the Transmission Line 2. Detail Engineering Design of the Transmission Line and Substation 3. Environmental and Social Study 4. Preparation of technical documents 5. Preparation of bid documents |
Rastriya Prasan Grid Company Limited |
|
Feasibility Study and Design of 132 kV Transmission Line of Langtang Khola Hydroelectric Project 20 MW Rasuwa July, 2022 - Ongoing |
Basic Data Collection. Field Reconnaissance Survey. DetailSurvey (Detailed survey, estimating of quantities and spotting of poles/towers), Preparation of Maps and Digitization of Map. Geological Survey. |
Paramount Construction Pvt. Ltd |
|
Consulting Services for Detailed Engineering and Environmental Study of Karmadev – Phukot 400 kV Double Circuit Karnali Corridor Transmission Line Project Kalikot, Dailekh, Surkhet, Achham and Kailali Districts September, 2018 - Ongoing |
(i) Detailed Survey of the Transmission Line (ii) Detail Engineering Design of the Transmission Line and Substation, (iii)Environmental and Social Study, (iv) preparation of technical documents; (v) preparation of bid documents |
Rastriya Prasan Grid Company Limited |
|
Consulting Service of Mewa Khola Hydropower Project (23 MW) for Updated Feasibility Study, Detailed Project Report and Preparation of Tender Documents along with 132 kV Transmission Line Study and Design of Project Road Taplejung April, 2026 - Completed |
Updated Feasibility Study, Detailed Project Report and Preparation of Tender Documents |
Union Mewa Hydro Ltd |
|
Detail Project Report & Tender Documents for 132 kV Transmission line of Seti Khola Hydro Electric Project. Kaski April, 2026 - Completed |
Geological mapping of the transmission line. Detailed Survey of the transmission line. Tower spotting, tower optimization in PLS-CADD software and check survey of the transmission line. Detailed Design of transmission line and Economic Analysis. Preparation of Detailed Project Report. Preparation of Technical Specifications and Tender Documents. |
Vision Lumbini Urja Co. Ltd. |
|
Preparation of Feasibility Study and Tender Documents for 220 kV Double Circuit Transmission Line from Isuwa Khola PRoR Cascade Hydroelectric Project to 220/132 kV Shitalpati Substation Sankhuwasabha July, 2022 - Ongoing |
ower Spotting and Tower Optimization in PLS-CADD software, Feasibility Study, Preparation of Tender Documents. |
Isuwa Energy Pvt. Ltd |
|
Tower Spotting and Optimization, Check survey, Preparation of Technical Specification and Tender Documents for 132 kV Single Circuit Transmission line from Luja Khola Hydroelectric Project to 132/33 kV Tingla Substation Solukhumbu August, 2022 - Ongoing |
Tower Spotting and Tower Optimization in PLS-CADD software, Check Survey Works, Preparation of Technical specification and Tender Documents |
Silk Power Private Limited |
|
SASEC (South Asian Sub Regional Economic Cooperation) Power System Expansion Project – Project Supervision Consultant All over Nepal February, 2017 - Ongoing |
Jade Consult is working in this project with Power Grid Corporation of India Limited, India and providing assistance in (i) ensuring quality in project implementation ii) supervision during construction, testing and commissioning of the different sub projects iii) Assist NEA to update the IEE/EIA and EMPs for the Individual sub projects, Review on Social and Environmental Monitoring Report, Prepare and Update land acquisition and resettlement plan. Preparation of social safeguard monitoring report and Ensure compliance with ADB for the subprojects as mentioned above. |
Nepal Electricity Authority |
|
Detailed Survey and Investigation and Preparation of IEE report and its subsequent approval from Govt. of Nepal for proposed 33 kV transmission line for Arun-3 HPP, PCD-69 Sankhuwasabha District January, 2017 - Completed |
Jade Consult provided services for: i) Preparation of detailed survey, plan and profile generation, tower spotting data & tower schedule of 33 kV Transmission line for the construction power of Arun 3 Hydropower Project. ii) Preparation of IEE report of the construction power line and its subsequent approval from govt. of Nepal. |
SJVN Arun-3 Power Development Company (P.) Ltd. |
|
Detail survey for 220 kV transmission line of Upper Trishuli-1 Project from the Switchyard to the nearest possible point of Nepal Electricity Authority (NEA)’s 220 kV Chilime – Trishuli Transmission System Project. Rasuwa District January, 2017 - Completed |
Jade Consult was worked in this project for providing the constancy service for the Detailed survey of the Proposed 220 kV Transmission line and Preparation of plan and profile, Tower Spotting and preparation of D- cards and Consultation for best possible interconnection point for Power evacuation to National Grid |
Nepal Electricity Authority |
|
Consulting Services for Engineering of the Construction of 220 kV Chilime – Trishuli Transmission System Project Rasuwa and Nuwakot Districts August, 2016 - Completed |
Jade Consult is working in this project with Power Grid Corporation of India Limited, India and providing assistance to complete the following tasks, (i) preparation of technical specification and bidding documents; ii) Preparation and Update of Social and Environmental Reports such as ESIA Report, LACP Report, ESMP and SEP Reports and Support NEA in implementation of the same. (iii) Support in bidding process; (ii) Supervision during construction, testing and commissioning of the project. |
Nepal Electricity Authority |
|
Consulting Services for Implementation Support for Tamakoshi (Khimti) – Kathmandu 220/400 kV Transmission Line Project – Procurement phase and Implementation phase Ramechhap, Dolakha, Sindhupalchowk, Kavrepalanchowk, Bhaktapur, Kathmandu Districts January, 2015 - Completed |
Jade Consult is working in this project with Power Grid Corporation of India Limited, India and providing assistance in (i) preparation of technical specification and bidding documents; (ii) support in bidding process; (iii) supervision during construction, testing and commissioning of the project. |
Nepal Electricity Authority |
|
Project Preparation Support for SASEC Power System Expansion Project Myagdi, Parbat, Baglung, Syangja, Palpa, Rupandehi, Tanahu, Chitwan, Gorkha, Dhading, Kathmandu, Nawalparasi, Lamjung, Manang Districts August, 2014 - Completed |
Jade Consult is working in this project with Power Grid Corporation of India Limited, India and providing assistance in (i) preparing designs, technical specifications and bidding –[documents; (ii) supporting of the bidding process and bid evaluation including preparation of technical and financial evaluation reports; (iii) assisting NEA in contract negotiation with the contractor until contract awarded and advance payment paid. |
Nepal Electricity Authority |
|
Owners Engineer for Hetauda – Dhalkebar – Duhabi 400 kV Transmission Line Project Makawanpur, Bara, Sarlahi, Rautahat, Mahottari, Dhanusha, Siraha, Saptari, Udayapur and Sunsari Districts June, 2012 - Completed |
Jade Consult is working in this project with Power Grid Corporation of India Limited, India and carrying out the construction supervision and quality assurance & inspection. Jade Consult Provided Following Services: Transmission Line: site supervision of check survey, route alignment survey, land parcel works, soil investigation works, soil resistivity test, tower foundation works, and tower erection works. Substation: site supervision of survey work, soil investigation works, electrical resistivity test, back filling works, transformer & repair section foundation works and road works. |
Nepal Electricity Authority |
|
Detailed Design and Study of 220 kV Transmission Line for Upper Trishuli –I Hydroelectric Project (216 MW) Rasuwa District May, 2013 - Completed |
Conduct Desk Study, Conduct Reconnaissance Survey, Identify pre-existing control points (National as well as local points), Traverse survey for carrying the known coordinates to the required area and establish Benchmark points, Conduct detailed route alignment survey, Prepare the plan and profile of the TL route alignment at appropriate scale, Locate angle tower positions, Fix concrete pillars at every angle points and permanent control points, Design of transmission line which includes the conductor optimization, sag calculation, tower type determination, standards & specifications and others, Design of grid connection arrangement for UT-I HEP at Trishuli 3B Hub. |
Saman Engineering |
|
IEE Study of 220 kV Transmission Line for 216 MW Upper Trishuli – I Hydroelectric Project Rasuwa District February, 2013 - Completed |
Jade consult completed IEE study according to which provided service such as preparation of Terms of reference, Consultation with local stakeholders. Collection of useful social information, suggestions and recommendations from local stakeholders, publication of public notice at the relevant public places, IEE report preparation and IEE study approval. |
Nepal Water and Energy Development Company Pvt. Ltd. |
|
Desk Study and Reconnaissance Survey of 400 kV Transmission Line of Lower Arun Hydroelectric Project (400 MW) Sankhuwasabha November, 2010 - Completed |
Jade consult provided services to carry out desk study and walkover survey of 162 km long 440kV transmission line from switchyard to Dhalkebar. |
Lower Arun Hydroelectric Pvt. Ltd. (Brasspower International Engineering) |
|
220 kV Khimti – Dhalkebar Transmission Line Project Sindhuli, Ramechhap, Mahottari, Dhanusha District July, 2005 - Completed |
Jade consult provided services for Construction Supervision, Quality Assurance and Contract Management services of 220kV Khimti- Dhalkebar Transmission Line Project. |
Nepal Electricity Authority |
|
Consulting Service for Project Supervision Consultants: Power Transmission and Distribution Efficiency Enhancement Project Kathmandu, Bhaktapur, Lalitpur, Kailali, Banke, Dang, Rupandehi, Kaski, Chitwan, Makwanpur, Parsa, Bara, Dhanusha, Sunsari and Morang Districts November, 2017 - Ongoing |
Jade Consult is working in this project with Power Grid Corporation of India Limited, India and providing assistance in (i) preparation of technical specification and bidding documents; (ii) support in bidding process; ((i) ensuring quality in project implementation ii) supervision during construction, testing and commissioning of the different sub projects (iv) Capacity Building of the NEA staff. |
Nepal Electricity Authority |
|
Study for Environmental and Social Considerations on Preparatory Survey on Transmission and Distribution System Improvement Project in Urban Area Pokhara September, 2020 - Ongoing |
ade Consult conducted the environmental and social study for the project meeting requirement for both the JICA Guidelines and Nepal’s relevant laws and regulations. The following key activities were performed: Baseline data collection on natural and social environment, stakeholder consultations, Preparation of Terms of Reference (TOR), Initial Environment Examination (IEE) study and preparation of IEE Study report, Analysis of environmental and social impacts and mitigation measures, Preparation of Environmental Management Plan (EMP) including monitoring plan, Preparation of Resettlement Action Plan (RAP). |
NEWJEC Inc./Nepal Electricity Authority (NEA) |
| Name of the Assignment | Scope of Work | Client |
|---|---|---|
|
Consulting Services for Detailed Survey and updated Line Design for 30 km of Changes in 400 kV Transmission Line Route Alignment Nuwakot, Dhading, Makwanpur, Tanahu, Nawalparasi, Kathmandu January, 2024 - Ongoing |
Inception of Assignment. Detailed Field Survey and Preliminary Engineering Design. Geo-Technical Investigation. Detailed Environmental and Social Assessment including flood risk assessment. Pegging activities. Preparation of final survey report after finalization of route and site verification. |
Millennium Challenge Account Nepal (MCA-Nepal) |
|
Consulting Services for Detailed Survey and updated Line Design for 30 km of Changes in 400 kV Transmission Line Route Alignment Nuwakot, Dhading, Makwanpur, Tanahu, Nawalparasi, Kathmandu July, 2024 - Completed |
Inception of Assignment. Detailed Field Survey and Preliminary Engineering Design. Geo-Technical Investigation. Detailed Environmental and Social Assessment including flood risk assessment. Pegging activities. Preparation of final survey report after finalization of route and site verification. |
Millennium Challenge Account Nepal (MCA-Nepal) |
|
Detail Engineering Design and Tender Document Preparation Khotang April, 2026 - |
Jade consult completed the detailed engineering design and tender document preparation of Rawa Khola Hydropower Project (6.5 MW). |
Dudhkoshi Power Company Pvt. Ltd. |
|
Feasibility Study, EIA study, IEE Study of 220 kV Transmission Line and Owner’s Engineer Services during Project Preparation and Design up to Financial Close Phase, Detail Design and Study of 220kV Transmission Line and Detail Design of Access Road Rasuwa April, 2026 - |
Jade consult completed feasibility study according to which it provided service such as geotechnical investigation, hydrological investigation, topographical survey, bathymetric survey, sediment analysis, project layout, project optimization study, construction material survey, rate analysis, access road study etc. that is required to complete the feasibility study of the hydropower project according to guidelines of DoED. The report has been submitted to DoED. |
Nepal Water and Energy Development Company Pvt. Ltd. |
|
Consulting Services for Feasibility Study Manang April, 2026 - |
Jade consult provided service such as geotechnical investigation, hydrological investigation, topographical survey, bathymetric survey, sediment analysis, project layout, project optimization study, construction material survey, rate analysis, access road study etc. as required completing the feasibility study of the hydropower project according to guidelines of DoED. The report has been submitted to the DoED. The scoping document and TOR for EIA was also prepared in compliance with Environmental Protection Act 2053 and Environment Protection Regulation 2054 |
Himtal Hydropower Company Pvt Ltd |
|
Consulting Services for Feasibility Study and Detail Design and Environmental and Social Impact Assessment (ESIA) Budhi Gandaki River April, 2026 - |
Inception of Assignment; Field Investigation and Data Collection for Engineering Studies; Field Investigation and Data Collection; Hydraulic, Hydrological and Sedimentological Studies; Power Evacuation Study; Finalization of Design Concept and Engineering Studies; Assessment of Impact of Flow Regulation on Downstream Facilities; Economic and Financial Analysis of the Project; Detailed Design and Tender Drawings; Construction Planning and Scheduling; Detailed Quantity Estimate; Cost Estimate; Preparation of Complete Tender Documents |
Budhi Gandaki Hydroelectric Project Development Committee |
|
Detailed Engineering Design, which also includes Access road and Transmission line survey and design along with Bid Document Preparation Dolakha April, 2026 - |
Detailed Engineering Design, which also includes Access road and Transmission line survey and design along with Bid Document Preparation of Upper Lapche Khola Hydropower Project (52MW). |
Energy Venture Pvt. Ltd |
|
Detail Engineering Design and Tender Document Preparation
April, 2026 - |
Jade consult completed the detailed engineering design and tender document preparation according to which it provided service such as collection of basic information/data through field surveys, investigations and laboratory tests, review of basic design which includes alignment study, review the results of hydrological study and sediment study of the project site to access its adequacy and reliability, detail power evacuation study, recommendations for construction materials & disposal site. Detailed engineering design including underground support design, design of access road and transmission line and tender drawings, construction planning and scheduling, detailed quantity estimate, cost estimate and preparation of complete tender documents (civil works, hydro-mechanical works, electro-mechanical works and transmission line works) was provided. |
Jhyamolongma Hydropower Development Company Pvt Ltd |
|
Environmental Impact Assessment (EIA) Study of Mugu Karnali Storage Hydro Electric Project (1902 MW) Mugu, Humla, Jumla, Kalikot and Bajura Districts November, 2022 - |
Environmental Impact Assessment Study (EIA) Study |
Vidhyut Utpadan Company Limited (VUCL) |
|
Feasibility Study of Upper Jeuligad Small Hydroelectric Project (2.91 MW) Bajhang April, 2021 - Completed |
Preparation of Feasibility Study Report including ESIA study. Carrying out Topographical Survey and Discharge Measurement Works. Feasibility Level Design and Drawings. Preparation of Transportation Survey Report. Preparation of BoQ and Cost Estimates. Preparation of Construction Schedule. Preparation of Financial and Economic Analysis Report. Preparation of Business Environment Study Report |
Woonsun Energy & Construction Co. Ltd |
|
Consulting Service of Mewa Khola Hydropower Project (23 MW) for Updated Feasibility Study, Detailed Project Report and Preparation of Tender Documents along with 132 kV Transmission Line Study and Design of Project Road Taplejung August, 2021 - Ongoing |
Updated Feasibility Study, Detailed Project Report and Preparation of Tender Documents |
Union Mewa Hydro Ltd |
|
Upper Trishuli 1 Hydroelectric Power Plant – Owner’s Engineer; Consultancy and Supervision Services (216 MW) Rasuwa November, 2021 - Ongoing |
Familiarization with EPC contractor’s design documentation and EPC contract. Propose potential design improvement. Conduct site visit, and design meetings. Perform site supervision of construction works and factory acceptance tests, quality control of construction materials. Inspect equipment and factory testing. Assist in the testing and commissioning works, provide reporting and documentation. Review and approval of the EPC construction design, Review and monitoring of program on submission of drawings by EPC contractor. Review and approval of the final design criteria and design parameters prepared by the EPC contractor. Review and approval of stability and structural analysis – weir and concrete structures including all underground structures. Review and approval of contractor’s design documents for hydro-mechanical, mechanical and electrical equipment. |
Nepal Water and Energy Development Company Pvt. Ltd |
|
Preparation of Supplemental Environmental and Social Documentation (SESD) for Tamakoshi V Hydroelectric Project (99.8 MW) Dolakha District February, 2020 - Completed |
Jade Consult provided the following services: 1. Conducted physical environment surveys including air, water, noise sampling, hydro census and visual surveys and traffic surveys 2. Conducted socio-economic surveys and consultations with local communities and stakeholders including census of affected households, inventory of affected assets, ecosystem services survey, river-dependent business, livelihood survey 3. Assessed impacts on Drinking/Irrigation Water, Social Impacts of Labor Influx, Downstream Impacts on Livelihoods and develop Local Employment Strategy, Pollution Control Strategy, Public Health and Safety Strategy, Resettlement Action Plan (RAP) including Gender Action Plan (GAP) 4. Development of Stakeholder Engagement Plan including identification of vulnerable groups and communities, and Indigenous People. 5. Restructure Environmental Management Action Plan (EMAP) and develop a monitoring plan 6. Assist in the preparation of Environmental Flow (EFlow) Assessment report 7. Assist in conducting Cumulative Impact Assessments 8. Assist in the preparation of Land Acquisition and Livelihood Restoration Plan (LALRP) 9. Assist in the preparation of Climate Change Assessment report Assist in the development of E&S specifications to be implemented by the Developer and the EPC contractor |
Tamakoshi Jalvidyut Company Limited (TKJVC) |
|
Preparation of Biodiversity Action Plan (BAP) for Tamakoshi V Hydroelectric Project (99.8 MW) Dolakha District February, 2020 - Completed |
Jade Consult provided the following services: 1.Provide support to reconnaissance visit 2.Assist in Inception report preparation 3.Review project EIA 4.Conduct terrestrial and aquatic ecology surveys and upgrade terrestrial and aquatic ecology baseline 5.Assist in conducting Critical Habitat Assessments 6.Assist in the development of consultation and partnership building strategy of Gaurishankar Conservation Area (GCA) 7.Assist in the development of reforestation strategy, aquatic biodiversity strategy and Biodiversity Action Plan 8.Organize residential workshop for sharing the findings with the stakeholders 9.Arrange and facilitate meetings and consultations with stakeholders, local government and community 10.Assist in the finalization of monthly progress reports, draft reports and final report. |
Tamakoshi Jalvidyut Company Limited (TKJVC) |
|
Feasibility and EIA Study of Upper Chameliya HPP (60 MW) Darchula District, Province no. 7 December, 2019 - Ongoing |
Jade Consult is providing services such as topographic survey and mapping, Hydrological, Metrological and sediment studies, Geological, Geophysical, Geotechnical Study and Mapping, Seismic study, Construction material survey and testing, mock disposal survey, Power evacuation survey, Construction power survey, Communication survey, Flood Assessment, Hydrological analysis, Hydraulic modelling, Access and Project road survey, Transmission line study, Camp and office survey, Land Inventory and Property Acquisition Survey, Preparation of Scoping documents and TOR, EIA study, Preparation of Design Memorandum, Selection of Project configuration and Optimization study, Construction planning and scheduling, quantity and cost estimation and Project Evaluation, preparation of Feasibility Study Report and EIA Report. |
Ministry of Energy, Water Resources and Irrigation, Department of Electricity Development (DoED) |
|
Feasibility and Environmental Impact Assessment Study of Kaligandaki Storage Hydropower Project (844 MW) Gulmi , Parbat, Baglung Districts March, 2020 - Ongoing |
Jade Consult is working in this project with SMEC International Pty. Ltd., Australia and assisting in; i) Conduct desk study and field reconnaissance survey, analyze the available data and identify data gap of previous study & recommend the further additional study needed with justification. ii) Prepare preliminary project layout and configuration (at least three options), examine alternative configuration(s) of project component in inception survey for further field survey and investigation. iii) Topographical survey including Longitudinal sections (L-section) and Cross sections (X-section).iii) Hydrological studies, sediment study and hydro-meteorological study. Geological survey, bathymetric survey, engineering geological mapping, geophysical and geotechnical investigations including drilling, seismicity/seismic study. iv) Construction materials survey and testing. v) Alignment survey of the 220kV / 400kV transmission line.vi) Feasibility survey of access and project road. Prepare feasibility study report with full documentation on the actual design including all design principle criteria, parameters and standards to which the project has been designed; all major calculations and analysis including all the drawings will be handover to DoED in the form of hard and soft copies along with working format. Flood Assessment, Hydrological analysis, Hydraulic modelling works were also done |
Department of Electricity Development (DoED) |
|
Simbuwa Khola Hydropower Project (70.3 MW) Taplejung District November, 2019 - Ongoing |
Jade Consult is working in this project in JV with SMEC International Pvt. Ltd., Australia and providing assistance in: •Review of the existing feasibility study •Hydrologial and sedimentological study •Geological, Geotechnical and Geophysical studies •Surveying and Mapping •Updated feasibility study •Power evacuation study •Desk Study, Reconnaissance Survey, Detailed Survey tower spotting, profiling, tower optimization and preparation of Bill of quantities and Cost estimation. •Optimization and layout finalization •Flood Assessment, Hydrological analysis, Hydraulic modelling, •Detail engineering design of hydropower components including the 132kV transmission line and associated substations. •Detail design of access roads •Preparation of Complete tender documents. |
Remit Hydro Limited (RHL) |
|
Feasibility Study of Dams in Dang Valley Dang District October, 2017 - Completed |
•Carried out detailed hydrological study of the five rivers; catchment characteristics, drainage system, water-uses, and water availabilty. •Conducted geological and geo-technical investigation of the area. This included geo-technical investigations at the dam sites of the proposed diversion projects (220 m of boring). •Assessed the availabilty of potential construction materials and seismicity of the area. •Prepared socio-economic profile of the area to ensure social safeguard, environmental study and prepared agricultural development plan. •Proposed diversion plan for the irrgation development that included 5 dams of differing heights from 15 m to 125 m. •Conducted detailed design of 5 dams: 3 of moderate heights as Earthen dams and 2 as Clay Core Rockfill Dam. 1. Dam at Vutiya Tal-15 m (Earthen Dam) 2. Dam at Ranighat Khola-43 m (Earthen Dam) 3. Dam At Balim Khola-70 m (Clay Core Rockfill Dam) 4. Dam at Vitri Khola-29 m (Earthen Dam) 5. Dam at Gwar Khola-125 m (Clay Core Rockfill Dam) •Conducted Initial Environmental Examination (IEE). •Conducted detailed cost estimate. •Prepared design drawings, and conducted economic and financial analysis. |
Mega Dang Valley Irrigation Project |
|
Detailed Design of Upper Trisuli – 1 HEP (216 MW) Rasuwa District July, 2015 - Completed |
Jade Consult provided the following services: 1. Technical Appraisal (review of work done, site review). 2. Hydrological and sediment studies: Review the results of hydrological study and sediment study of the Project site to access its adequacy and reliability. Flood Assessment, Hydrological analysis, Hydraulic modelling works 3. Plant Design: Review technical design criteria, standards applied and their appropriateness, design drawings and technical specifications. 4. Detailed Design: Involved in the Detailed Design review and support in finalization of detail design, drawings and cost estimates. 5. Technology: Review and discuss the commercial operating history of each major component and the reliability of major equipment such as turbines and transmission equipment. 6. Review of EPC Contract. The detail design was submitted to and approved by DoED. |
Nepal Water and Energy Development Company Pvt. Ltd |
|
Feasibility Study and IEE of Jawa Khola HPP (15.25 MW) Jumla District June, 2016 - Complete |
Jade consult completed the feasibility and IEE study according to which it provided the following services. 1.Prepare Feasibility level design of the project along with reports and drawings 2.Carried out Geotechnical and Geophysical investigation, Construction material survey and testing (Core drilling of 140m and ERT 3990m) 3.Detail Design and survey of Project Access road of about 14 km length from Jumla Khalanga bazar to proposed headworks site of the project 4.Selection of Electromechanical Equipment including its cost estimate 5.Carried out desk study and reconnaissance survey of 132 kV transmission line from Switchyard of Jawa Khola Hydropower Project to proposed Lamra substation of NEA 6. Power evacuation study of the project including layout of switchyard, preparation of Single Line Diagram of the powerhouse including the interconnection point for the project. 7. Prepare quantity and cost estimate and construction plan of Project including Transmission Line and switchyard. 8.Carried out IEE study of the project along with flood Assessment, Hydrological analysis, Hydraulic modelling 9.Preparation of Construction Planning and Scheduling, Financial and Economic analysis of the project The report has been submitted and approved by DoED. |
Department of Electricity Development |
|
Feasibility Study of Upper Seti Hydropower Project, 20 MW Kaski district March, 2017 - Completed |
Jade consult completed feasibility study according to which it provided service such as field investigation and data collection for engineering studies like geotechnical investigation, hydrological investigation, topographical survey, bathymetric survey, sediment analysis, project layout, project optimization study, power evacuation study, Flood Assessment, Hydrological analysis, Hydraulic modelling, construction material survey, rate analysis, access road study, economic and financial analysis of the Project etc. That is required to complete the feasibility study of the hydropower project according to guidelines of DoED. |
Upper Seti Hydro Pvt. Ltd. |
|
Detail Engineering Design and Tender Document Preparation of Karuwa Seti Hydropower Project (32MW) Kaski district June, 2017 - Completed |
Jade consult completed the detailed engineering design and tender document preparation according to which it provided service such as collection of basic information/data through field surveys, investigations and laboratory tests, Flood Assessment, Hydrological analysis, Hydraulic modelling, review of basic design which includes alignment study, review the results of hydrological study and sediment study of the project site to access its adequacy and reliability, detail power evacuation study, recommendations for construction materials & disposal site. Detailed engineering design including underground support design, design of access road and transmission line and tender drawings, construction planning and scheduling, detailed quantity estimate, cost estimate and preparation of complete tender documents (civil works, hydro-mechanical works, electro-mechanical works and transmission line works) was provided. |
Jhyamolongma Hydropower Development Company (P) Ltd. |
|
Detailed Engineering Design, which also includes Access road and Transmission line survey and design along with Bid Document Preparation of Upper Lapche Khola Hydropower Project (52 MW) Dolkha District September, 2016 - Completed |
Detailed Engineering Design, which also includes Access road and Transmission line survey and design along with Bid Document Preparation, Flood Assessment, Hydrological analysis, Hydraulic modelling, of Upper Lapche Khola Hydropower Project (52MW). |
Energy Venture Pvt. Ltd. |
|
Feasibility Study and Detail Design of Budhi Gandaki Hydroelectric Project (1200 MW) Dhading, Gorkha February, 2013 - Completed |
Jade Consult has provided following services: Inception of Assignment; Field Investigation and Data Collection for Engineering Studies; Field Investigation and Data Collection; Hydraulic, Hydrological and Sedimentological Studies; Power Evacuation Study; Finalization of Design Concept and Engineering Studies; Assessment of Impact of Flow Regulation on Downstream Facilities; Economic and Financial Analysis of the Project; Detailed Design and Tender Drawings; Construction Planning and Scheduling; Detailed Quantity Estimate; Cost Estimate; Preparation of Complete Tender Documents Field study includes topographical survey, bathymetric survey, survey control networking, transmission line survey as well as LIDAR survey (115km2), geo-technical investigations such as diamond core drilling (about 1800m), dilatometer tests, Plate Jacking Test (6 set of tests in 6 niches), various lab tests including investigation adit (900m), geophysical investigation (ERT 3100m and SRT 7100m), construction material survey, hydrological, meteorological, Sedimentological Investigation & Hydraulic Model Studies. The complete 25 sets of Feasibility Study, Detail Design Study and Tender Documents has already been submitted to Budhi Gandaki Hydroelectric Development Committee (BGHPDC). |
Budhi Gandaki Hydroelectric Project Development Committee |
|
Environmental and Social Impact Assessment (ESIA) of Budhi Gandaki Hydroelectric Project (1200 MW) Dhading, Gorkha February, 2013 - |
Jade Consult Provided Following Services: Jade Consult completed ESIA study according to which it provided service such as preparation of scoping documents and Terms of reference, baseline study of existing environment, forecasting impact on the environment, identification of mitigation measures, preparation of environmental management action plan, public hearing with stakeholder, Preparation of Land Acquisition & Resettlement Action Plan (LARRAP), Preparation of Public Consultation Disclosure Plan (PCDP) and Indigenous People/Vulnerable Community Development Plans (IPVCDP) as per the Environment Protection Act, 2053 and Environment Protection Rule, 2054 to the satisfaction of the line Ministry and Ministry of Environment. The final report after incorporating comments has already been submitted to to Budhi Gandaki Hydroelectric Development Committee (BGHPDC) and is in the process of approval. |
Budhi Gandaki Hydroelectric Project Development Committee |
|
Feasibility Study of Upper Trisuli – 1 HEP (216 MW) Rasuwa District January, 2007 - Completed |
Jade consult completed feasibility study according to which it provided service such as geotechnical investigation, hydrological investigation, topographical survey, bathymetric survey, sediment analysis, project layout, project optimization study, construction material survey, Flood Assessment, Hydrological analysis, Hydraulic modelling,, rate analysis, access road study etc. that is required to complete the feasibility study of the hydropower project according to guidelines of DoED. The report has been submitted to DoED. |
Nepal Water and Energy Development Company Pvt. Ltd |
|
EIA study of Upper Trishuli-1 HEP (216 MW) Rasuwa District February, 2008 - Completed |
Jade Consult completed EIA study according to which it provided services such as preparation of scoping documents and Terms of reference, baseline study of existing environment, forecasting impact on the environment, identification of mitigation measures, preparation of environmental management action plan, public hearing with stakeholder as per the Environment Protection Act, 2053 and Environment Protection Rule, 2054 to the satisfaction of the line Ministry and Ministry of Environment. The report is already approved by Ministry and copy has been provided to DoED and MoEn. |
Nepal Water and Energy Development Company Pvt. Ltd |
|
Owner’s Engineer Services for 216 MW Upper Trishuli – I Hydroelectric Project During Project Preparation and Design up to Financial Close Phase Rasuwa District July, 2015 - Completed |
The Services provided covers i) Preparation and Design upto Financial Close Phase, (ii) the Construction phase and (iii) the Operational Phase and will include but not limited to: 7. Technical Appraisal (review of work done to date, site review). 8. Hydrological and sediment studies: Review the results of hydrological study and sediment study of the Project site to access its adequacy and reliability. 9. Plant Design: Review technical design criteria, standards applied and their appropriateness, design drawings and technical specifications. 10. Technology: Review and discuss the commercial operating history of each major component and the reliability of major equipment such as turbines and transmission equipment. 11. Review of EPC Contract. 12. Recommendation Amount of Contingent Support. 13. Power Purchase Agreement. 14. Interconnection with NEA System. 15.Operation and Maintenance etc. |
Nepal Water and Energy Development Company Pvt. Ltd |
|
Detail Design of Access Road for 216 MW Upper Trishuli-I Hydroelectric Project. Rasuwa District May, 2013 - Completed |
Review of basic design which includes alignment study, standards & specifications, Conduct engineering design of the permanent road and other facilities, Carry out hydrological studies & cross drainage works, Preparation of engineering drawings and report including necessary calculation & specifications, Preparation of quantity estimation, Recommendations for construction materials & disposal site. |
Saman Engineering |
|
Feasibility Study of Upper Marsyangdi – 2 HEP (125MW) Manang & Lamjung Districts January, 2006 - Completed |
Jade consult provided service such as geotechnical investigation, hydrological investigation, topographical survey, bathymetric survey, sediment analysis, project layout, project optimization study, construction material survey, rate analysis, access road study etc. as required completing the feasibility study of the hydropower project according to guidelines of DoED. The report has been submitted to the DoED. The scoping document and TOR for EIA was also prepared in compliance with Environmental Protection Act 2053 and Environment Protection Regulation 2054. |
Himtal Hydropower Company P. Ltd |
|
Detail Engineering Design and Tender Document Preparation of Rawa Khola Hydropower Project (6.5 MW) Khotang District April, 2014 - Completed |
Jade consult completed the detailed engineering design, Flood Assessment, Hydrological analysis, Hydraulic modelling, and tender document preparation of Rawa Khola Hydropower Project (6.5 MW). |
Dudhkoshi Power Company Pvt. Ltd |
|
Survey and Detail Design of 26 Km Access Road for Lower Arun Hydroelectric Project (400 MW) Sankhuwasabha District September, 2012 - Completed |
•Hydrological studies and analysis of data •Advisory services on power sales to PTC India •Engineering support services •Desk study and walkover survey of 162 km long 440kV transmission line from project switchyard to Dhalkebar •Survey and design of 26 km long single lane access road at project site •Topographical and cross section bathymetric surveys |
Braspower International Engineering, Brazil |